res and they act against the substructure elements. Aside from these concerns, the contractor must also be ready to address the aftermath of the water and soil dilemma. Ground frost, corrosion, cracking, and even uv rays assist the negative loads of the unpredictable water and soil.
Knowing that those negative elements will always be factors, means countermeasure. The pre-construction phase of the project is vital to the longevity and durability of the homes substructure elements. Upon excavation for foundations, footing, and retaining walls if necessary, the water table
...